Richton Phoemsin-Don Mueng
This project was entirely designed in the precast structure and bearing wall systems caused a work slowdown or acceleration periodically.
Thus, wie needed to design and estimate a cost-effectiveness assessment by applying a cast-in-place structure mixed with precast in some periods and also presenting the value comparison to the project owner in every milestone.



